Spray Feature
Spray Feature Title
Each new day seems busier than the last as teams continue to work on new models at the GB factory – including the 54 Heritage EU. The first 54EU in production marked an important milestone last week: decking, when the hull and deckhouse are joined together during the construction process. Our last update showed photos of each of these parts in layup and coming out of the mold, and since that time quite a lot has happened. Engines, transmissions and wiring harnesses were installed for the V-drive system, along with other major mechanical and electrical systems. Interior modules have been built, finished and fitted into place within the hull. And construction and assembly of many other parts throughout the vessel has completed or is currently in progress. There's still lots more to come, of course – watch for another update coming in April when 54EU-001 completes her Stage 2 Inspection and makes her move out to the finishing shed. Until then, enjoy these behind-the-scenes photos of this new Heritage Series flagship in production.

Click here for an exclusive set of behind-the-scenes photos from our factory!



< Return to Spray Stories Page >
CONNECT WITH GB
Facebook Twitter YouTube

© 2014 Grand Banks Yachts, Ltd.
Images on this site may show options, equipment or other features not available on current models. Please contact your Authorized Dealer for most current and accurate specifications and information.